Work Completed Shotcrete forms.
Work Completed Met about tree removal
Work Completed Set By-Pass Pumps
Work Completed Installed Inclinometers
Work Completed Cleanup Graveled South Entran
Work Completed Began Silt Fence
Work Completed Safety Training
Work Completed Removed Trees South End
Work Completed Trees Removed Fence Installed
Work Completed Started work South Access
Work Completed Began South Road
Work Completed Tree Work South Access Road
Work Completed Tree Work
Work Completed Cleared Trees Started Bench
Work Completed Tree North End dayneeds fixing
Work Done Cleared Rives side Bench start
Work Completed Cleared Debris North end
Inclement Weather Too Muddy
Inclement Weather Too Muddy
Inclement Weather Muddy
Work Completed Cleared Started Bench Rives
Work Completed Tree Clearing Finished Jersey
Acceptabble Conditions/No Test Program
Work Done No work due to weather.
Work Completed Started Forming Northwall
Work Completed Placing sheet plastic over for
Inclement Weather No Work
Inclement Weather No work due to rain. .38" rain
Work Completed fueling Equipment
Work Completed Started South Bench
Work Completed Continue hauling fill
Work Completed Put Plastic over Fill
Work Completed Continued Fill
Work Completed Reinforce fence.
Work Completed Fence repair
Work Completed Continued work on top bench
Work Completed Upper Bench Reinforce E & S
Work Completed Worked on E & S Plastic
Work Completed Met about wall construction
Work Completed Repair Silt Fence Mobilze Wall
Work Completed Safety fence, mobilize equipme
Work Completed Traffic control, drill 3 nails
Work Completed HBI worked on drill
Work Completed HBI worked on driling
Work Completed Drilledand grouted 10 holes
Work Completed HBI drilled 21 so far
Work Completed Drilled and grouted installed
Work Completed Form work, drilling nails
Work Completed Drilling, Crowder forming wall
Work Completed Installed mesh Shotcrete
Work Completed Install Mesh rebar Formed wall
Work Completed Mesh, rebar, forms
Work Completed Forms, shotcrete.
Work Completed Shotcrete face Poured footer
Work Completed Backfill Southend Formed North
Work Completed Shotcrete, excavate
Work Completed Drill nails, pull forms
Work Completed Shotcrete excavation
Work Completed DRilling, placing fill
Work Completed Mesh, excavate
Work Completed Shotcrete prep
Work Completed Shotcrete, drill.
Work Completed Nails, traffic control
Work Completed Forms and mesh.
Work Completed Shotcrete forms.
Work Completed Drill, mesh.
Work Completed Shotcrete, excavate
Work Completed Excavation, clean up.
Work Completed Shotcrete, excavate.
Work Completed Drill, excavate.
Work Completed Shotcrete, excavate.
Work Completed Mesh, rebar, excavate
Work Completed Shotcrete, drill
Inclement Weather Rainfall totals
Inclement Weather Cleanup after rain
Work Completed Shotcrete, traffic control.
Work Completed Drill place plastic.
Work Completed safety fence
Inclement Weather Rained Out, no work.
Work Completed Test nails, v ditch work.
Work Completed Shotcrete, grading
Work Completed Excavate, drill.
Work Completed Excavation, clean up.
Work Completed Haul trash
Work Completed Mesh, shotcrete.
Inclement Weather Staging drill equipment
Work Completed Drill and grout.
Work Completed shotcrete, excavate.
Work Completed Dill, grout, mesh.
Work Completed Shotcrete, excavate.
Work Completed Shotcrete, excavate.
Work Completed Drill.
Work Completed Drilling
Work Completed Drill and grout.
Work Completed Shotcrete, excavate.
Work Completed Excavate, clean up
Work Completed Clean, survey
Work Completed Reinforcing silt fence
Work Completed Shotcrete, excavate.
Work Completed Excavate, clean up
Work Completed Excavate, haul fill.
Work Completed Work stop order issued
Work Completed Excavate, haul fill.
Work Completed Haul debris, work on fence.
Work Completed Prep work
Work Completed Excavate, work on ditch
Work Completed Excavate, work on ditch
Work Completed Excavate, formwork.
Work Completed worked on V ditch
Work Completed finishing forms for concrete
Work Completed Pipe, manhole 43 3
Work Completed Install pipe.
Work Completed Continue pipe installing
Work Completed Crowder back after break
Work Completed Demo.
Work Completed Install pipe, manhole.
Work Completed Check silt fence
Work Completed
Work Completed Install pipe
Work Completed Install pipe.
Work Completed Excavate, formwork.
Work Completed Install pipe.
Work Completed Install pipe.
Work Completed installing manhole 43 1
Work Completed Progress meeting
Work Completed
Work Completed Concrete
Work Completed Line test.
Work Completed Pump water, work guardrail
Work Completed Mini ex fell
Work Completed Grading, v ditch.
Work Completed Grading, v ditch.
Work Completed Grading, v ditch.
Work Completed work on V ditch
Work Completed Forms.
Work Completed V ditch.
Work Completed Rain problems
Work Completed V ditch.
Work Completed Fence prep.
Work Completed pouring concrete
Work Completed pouring concrete
Work Completed rip rap placed
Work Completed Grouting top of wall
Work Completed Final grading
Work Completed Pour concrete spillway
Work Completed Hero seeding
Work Completed Demobilizing
Work Completed Punch list
Work Completed Begin paving
Work Completed clean up
Work Completed apply reinforcement membrane
Work Completed Finishing punch list
Work Completed Finishing tree work
Work Completed remove silt fence
Work Completed Invert
Work Completed Shotcrete, excavate.
Work Completed Install pipe